Low temperature asphalt to be used on East Yorkshire road to reduce CO2

Share This Post

Low temperature asphalt is being used to repair a village road to reduce the works’ carbon footprint.

The £150,000 resurfacing work on the A614 road in Middleton on the Wolds, near Driffield will start on Monday.

East Riding of Yorkshire Council said using the cooler asphalt reduces the amount of energy needed to manufacture the material and allows roads to be reopened more quickly than hot asphalt.

Road closures will be in place and the work is expected to take two weeks.

Councillor Chris Matthews, the council’s portfolio holder for environment and climate change, said: “It’s double good news that this method means the work will be carried out more quickly and will reduce its carbon footprint.

“I’d like to thank residents and motorists for bearing with us while this scheme is completed.”

The council said that the work involved repairing failed areas of the road on Front Street, along with damaged manhole covers.

Resurfacing work will also take place in Church Hill Road, between the mini roundabout and the edge of the village.

Church Hill Road will be temporarily closed on weekday evenings between 19:00 BST and midnight from 27 June to 8 July.

During the road closure, a signed diversion will be in place via the A614 road to Shiptonthorpe, the A1079 to Beverley, then the A1035 and B1248 to Bainton.

Access during the road closure will only be permitted for properties within the works area.

The road closure will be removed after each working shift.

Disclaimer: This article was not originally written by a member of the GreenerHighways.co.uk team.

Stories, not spreadsheets: the sustainability event aimed at the people who keep places running

A new UKGBC leadership event puts communication at the centre of sustainability delivery. For councils and contractors, the lesson is blunt: good engineering still needs a coherent answer to what changes, who benefits, and why the disruption is worth it.

Britain’s roads were built for a climate that no longer exists

Heat lingers longer. Rain arrives harder. And the network itself is older than the weather now testing it. Resilience has stopped being a conference theme and become a maintenance problem.

Thousands of streetlights, one quiet transformation across Warrington and Liverpool

A fresh push on LED streetlights in Warrington and Liverpool points to a quieter kind of road upgrade: less power, lower maintenance and a different night-time streetscape for drivers and residents.

National Highways – 650,000kWh a year: inside the solar retrofit of 16 working highway depots

National Highways has fitted 825kW of solar, 760kWh of battery storage and 18 heat pumps across 16 operational sites, all while maintenance crews kept working. The programme will generate nearly 650,000kWh of renewable electricity annually.